Kitchen Revamp (Day 3 and 4)
Basically two days of lightly sanding and then applying oil-based polyurethane. All wrapped up in no more than one hour in the morning, then left to dry at least 24 hours. In the end, we were happy with the resultsĀ – the floor blended in […]